Closing Thought–29Aug19

I have not been a fan of the newest super jet fighter that the defense industry is making and selling around the world….personally I think it is a worthless waste of money and I have written as much…..https://lobotero.com/2016/11/03/f-35-the-flying-turd/

After $1.45 trillion….. yep that is trillion with a “T”….and this brick still cannot get off the ground….

The fleet of F-35 Joint Strike Fighters flying in the critical operational testing phase is struggling to stay airborne, which could delay the troubled program’s great leap forward into mass production.

As I recently reported for the Project on Government Oversight (POGO), a document from the program’s test force shows that the fleet’s test aircraft, housed at California’s Edwards Air Force Base, have netted an average 11 percent “fully mission capable rate”—the key measure of how often an aircraft can perform all of its assigned missions—since the process began last December. 

Why the $1.45 Trillion F-35 Still Can’t Get Off the Ground

This plane is the state of the art in electronic devices and weaponry….and yet we let the Chinese make parts for the “super fighter”…..

On Jun. 14, 2019 Sky News reported that a Chinese-owned company has been manufacturing key circuit boards for F-35 Lightning II fifth generation fighters flown by the U.K. and U.S.

Exception PCB, based in Gloucestershire, southwest England, which produces the parts was acquired in 2013 by its Chinese parent, Shenzhen Fastprint.

The circuit boards control many of the F-35’s core capabilities, including its engines, lighting, fuel and navigation systems, the Ministry of Defense (MoD) said in a press release.

However the MoD said Exception PCB is an established manufacturer and presents no risks to the fighter F-35’s supply chain.

Chinese-owned company produces parts for F-35 Fifth Generation Fighters

Let me get this straight….on the most sophisticated fighter jet in the world and we out-sourced the production of needed parts?

Seriously?  We go to the Walmart of the defense industry for the top secret parts?

Wonder why NO infrastructure then look no further than this piece of crap…..now ask why?

Where were the so-called “deficit hawks” on this one?

God I love this stuff!

Learn Stuff!

“Lego ergo Scribo”

3 thoughts on “Closing Thought–29Aug19

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.